Wacker Neuson Cub 200 Návod k obsluze Strana 28

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 50
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 27
Maintenance Cub 200/300/300 HD
wcghi_tx000721gb.fm 28
4.2 Removing and Installing the Burner Assembly
See graphic: wcghi_gr004015
Before performing any maintenance on the burner assembly, it must
be removed from the machine. To remove or install the burner
assembly perform the following procedure:
Removal:
4.2.1 Shut down the machine and allow it to cool.
4.2.2 Disconnect the power cord from the power source.
4.2.3 Remove the two bolts (a) and open the access panel.
4.2.4 Remove the screw (d) to disconnect the ground wire (c) from the
burner assembly.
4.2.5 Rotate the burner assembly (b) counter-clockwise and remove it from
the flame head and air tube assembly (e).
4.2.6 Perform the required maintenance.
Note: Refer the maintenance procedures in this manual.
4.2.7 Re-install the burner assembly. Refer to the steps below to install the
burner assembly.
Installation:
4.2.8 Place the burner assembly into the flame head and air tube assembly
(e).
4.2.9 Rotate the burner assembly clockwise to lock it into place.
4.2.10 Install the ground wire (c) using the screw (d).
4.2.11 Close the access panel and re-install the two bolts (a) that secure the
panel.
Zobrazit stránku 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 49 50

Komentáře k této Příručce

Žádné komentáře